(10/06/2007) Rear showing compartments sitting where they will be mounted and rear storage area under pump and tank
|
|
(10/06/2007) Front showing brush guard installed
|
|
| |
|
|
(10/06/2007) An inspection trip of the new Brush 2 was done. It is about a month from being completed.
|
|
| |
(10/06/2007) The future Brush 2 at DPC in Marydel
|
|
|
| |
(10/06/2007) The Ford F350 that will become Brush 2 inside the fabrication shop at DPC
|
|
(10/06/2007) Storage bin under the pump and tank
|
|
| |
(10/06/2007) Center slide out tray
|
|
(10/06/2007) Pump manifold ready for paint
|
|
| |
(10/08/2007) Lettering has been completed
|
|
(10/08/2007)
|
|
| |
(10/08/2007) Raft 22 and the future Marine Support Unit 22
|
|
(10/08/2007)
|
|
| |
(10/08/2007) Rear showing the Yamaha 90hp Motor
|
|
(10/08/2007) Center console with radar screen and switches to control the various lights and accessories
|
|
| |
(10/08/2007) Arch with radar, search light and warning beacon
|
|
(10/08/2007) Raft 22 is back at Station 22 and awaits for the remainder of the loose equipment to be added and training to be completed
|
|
| |
(10/17/2007) Command 2 and Utility 2
|
|
(11/11/2007) Front end with receiver hitch installed, warning lights and brush guard
|
|
| |
(11/11/2007) Side shot showing compartment and scene light
|
|
(11/11/2007) Havis Shield scene light installed
|
|
| |
(11/11/2007) Center console reinstalled after being coated with "Line X"
|
|
(11/11/2007) Rear showing compartments, warning lights, pump and hose reel
|
|
| |
(11/11/2007) Rear with tailgate closed
|
|
(11/11/2007) Rear of Brsuh 2
|
|
| |
(11/11/2007) Fuel line for pump and exhaust shroud installed on pipe
|
|
(11/11/2007) Brush 2 almost complete at DPC in Marydel
|
|
| |
(11/16/2007) Fron end of the new Brush 2
|
|
(11/16/2007) Drivers side 3/4 view
|
|
| |
(11/16/2007) Brush 2 almost complete
|
|
(11/16/2007) Driver side 3/4 rear view
|
|
| |
(11/16/2007) Rear of Brush 2 showing under skid compartment, pump panel and pump
|
|
(11/16/2007) Brush 2 is nearing completion and shoud be done in a coupel more weeks
|
|
| |
(12/13/2007) Safety chevron striping added to the rear of Brush 2
|
|
(12/13/2007) Brush 2 has been lettered and striped and awaiting the door seals to be applied
|
|
| |