Mechanicsville Volunteer Fire Department
Mechanicsville Volunteer Fire Department, Inc.

Upcoming Events
Dec 08, 2024
Children's Santa Bingo

Dec 22, 2024
Children's Christmas Drive Thru

View All Events



2024 Incidents
Jan 90
Feb 78
Mar 80
Apr 85
May 72
Jun 99
Jul 77
Aug 75
Sep 83
Oct 68
Nov 125
Dec 10
Total 942

2024 Jobs
Fires 14
Cuts 17

Past Incidents
2023 958
2022 1112
2021 900
2020 984
2019 873
2018 907
2017 872
2016 931
2015 884
2014 797
2013 830
2012 862
2011 874
2010 843
2009 773
Total 13400


New Utility Production Update
Email Print RSS Facebook Twitter RSS

By Apparatus Committee
July 14, 2024

The Department Apparatus Committee has been busy building specifications for three new pieces of apparatus.

One of those vehicles is a replacement for our 2007 Ford F250 Utility vehicle. The committee decided on a Chevrolet 3500 Cab/Chasis with the pickup bed deleted. A Knapheide Utility body was opted to allow us to carry some equipment to make the vehicle more suitbable for our needs.

In the summer of 2023, both the cab/chasis and body were ordered. The cab/chasis was constructed at the General Motors plant in Michigan and has been completed awaiting shipment to the body builder.

The body is currently at DeJana in Rosedale, Maryland and will be prepped and painted once the pick up arrives. Once it is completed at Dejana, it will move to ISG for lettering and graphics and eventually to Nelson Emergency for warning light installation.

Stay tuned for updates as this vehicle moves thru its build process. Pictures of the body on the DeJana lot and a rendition of what the cab will look like are attached.

4/26/24 Update:
The cab/chasis has arrived at the body builders facility and the body is currently in the paint booth for paint and Line-X work. They are advising their portion of the uplift will be completed on or around May 17th. From there, it will go to Criswell Chevrolet for a couple days, then to graphics and finally warning light installation.

5/3/2024 Update:
The body has been installed and work by the body up fitter is complete. It will now head to Criswell Chevrolet for delivery prep.

5/10/2024 Update:
The truck has been delivered by Criswell Chevrolet and we have taken it to IGS for graphics/lettering installation.

5/17/2024
The graphics rendering was received by the Department this week. Completion is expected this week and then will be moved to Nelson's Emergency Vehicle Lighting for unfitting.

5/26/2024
The truck has been delivered and sent to Nelson's Emergency Vehicle Lighting for unfitting.

7/14/2024
The truck has completed equipment mounting from First Due Apparatus Solutions and now awaiting going in service.


Add a Comment Add a Comment 0 Comment(s)


Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
The Firefighters of Mechanicsville
28165 Hills Club Road
P.O. Box 37
Mechanicsville, MD 20659
Emergency Dial 911
Phone: 301-884-4709
General Inquiry Form
E-mail: info@mvfd.com
Copyright © 2024 Firehouse Solutions (A Service of Technology Reflections, Inc.)
Visitors Since Mar 15, 2004: 9,394,023   |  Visitors Today: 1,476