ISO Inspection Measures Water Supply Abilities in Mechanicsville

 
By Lieutenant Joseph Guyther
March 30, 2002
 

As part of the Insurance Services Office (ISO) grading process, Mr. Fred Brower recently conducted an inspection and testing of all of the Saint Mary’s and Calvert county water supply apparatus which would respond on the first or second alarm in the Mechanicsville VFD first due area.

The tests consisted of having the tankers or pumper-tankers travel 200 feet, stop, dump their load and travel an additional 200 feet. This test simulated a tanker dumping operation. A second test consisted of having the water shuttle apparatus travel 200 feet, stop, fill and travel an additional 200 feet. This test simulated a tanker fill operation. These two tests combined, simulated a tanker shuttle operation with the exception of the travel time required to go from the water source to the fire site and back. The ISO uses a standard formula to determine travel time which is based on distance. The results of these tests are shown in the table. It is noteworthy that Tanker 2 had some of the best numbers in the dumping and filling categories.

TankerDeptTank SizeDump Size ArrangementDump TimeDump Rate GPMFill Size / ArrangementFill TimeFill Rate GPM
TA2Mechanicsville300010" square rear2 min 5 sec14294" line into 4" rear direct fill3 min 20 sec909
E24Mechanicsville20006" round rear with jet assist2 min 21 sec8334" line into 6" rear direct fill2 min 33 sec769
E224Mechanicsville200010" square rear1 min 31 sec13334" line into rear direct fill2 min 57 sec667
E71Hollywood20006" round rear with jet assist2 min 14 sec9094" line into 3" rear direct fill3 min 4 sec645
E14Leonardtown200010" square rear1 min 30 sec13334" line into 3" rear direct fill2 min 47 sec714
E51Seventh District200010" square rear1 min 48 sec11114" line into 3" rear direct fill3 min 10 sec625
E53Seventh District22006" round rear3 min 22 sec6474" line into 2.5" intake thru pump3 min 53 sec564
CATA2Prince Frederick30006" round side2 min 51 sec1034(2) 3" lines into (2) 3" rear direct fills3 min 15 sec909
CTA1La Plata280012" round rear4 min 0 sec7004" line into rear direct fill4 min 11 sec667
CTA2Hughesville15004" round rear6 min 1 sec250(2) 3" lines into (2) rear direct fills3 min 58 sec375
CTA10Bel Alton15005" round rear5 min 13 sec2883" line into 5" rear direct fill3 min 10 sec469
CE53Benedict20006" round rear2 min 54 sec690(2) 3" lines into (2) rear direct fills4 min 21 sec455

Dump Time based on starting 200' away with water tank full, proceed (manuever) to dump site, dump the capacity of the tank, and then proceed 200' away from the dump site.

Fill Time based on starting 200' away with the water tank empty, proceed (manuever) to fill site, fill the capacity of the tank from empty to full, and then proceed 200' away from fill site.

Tests for tankers TA2 through CATA2 conducted on 3/30/02 and filling done by Mechanicsville E23 from draft.

Tests for tankers CTA1 through CE53 conducted on 12/15/02 and fill done by Tenth District, Charles Co. E83 from draft.


Mr. Brower also conducted fire site tests on the first, second and third due pumpers to evaluate our ability to supply the fire attack from a folding tank. Engine 21, Engine 222 and Engine 72 were tested to determine their draft set up times on a folding tank. Engine 23 was tested on the folding tank, at a dry hydrant, at a cistern, at a wet hydrant and at a draft site pond to determine set up times for a tanker fill site.

E21 for set up as a Fire Site Pumper from folding tank = 57 secs
E222 for set up as a Fire Site Pumper from folding tank = 1 min, 0 sec
E23 set up as a Supply Site Pumper from dry hydrant = 59 secs
E23 set up as a Supply Site Pumper from cistern at fire station = 46 secs
E23 set up as a Supply Site Pumper from draft at pond = 1 min, 43 secs
E23 set up as a Supply Site Pumper from hydrant = 51 secs
E23 set up as a Supply Site Pumper from folding tank = 48 secs
E72 set up as a Supply Site Pumper from folding tank = 1 min, 35 secs


Overall, the crews manning the fill lines and setting up the draft with the pumpers did an excellent job with most set ups taking a minute or less. Those incredible times are to be noted with pride.

Our second round of testing will be on May 6th at Hughesville. We will be testing additional Charles and Prince Georges tankers and a Hughesville pumper.

 
Units: Eng 21, Eng 222, Eng 23, Eng 72, Eng 24, Eng 224, Eng 71, Eng 14, Eng 51, Eng 53, Tanker 2, Calvert Tanker 2