As part of the Insurance Services Office (ISO) grading process, Mr. Fred Brower recently conducted an inspection and testing of all of the Saint Mary’s and Calvert county water supply apparatus which would respond on the first or second alarm in the Mechanicsville VFD first due area.
The tests consisted of having the tankers or pumper-tankers travel 200 feet, stop, dump their load and travel an additional 200 feet. This test simulated a tanker dumping operation. A second test consisted of having the water shuttle apparatus travel 200 feet, stop, fill and travel an additional 200 feet. This test simulated a tanker fill operation. These two tests combined, simulated a tanker shuttle operation with the exception of the travel time required to go from the water source to the fire site and back. The ISO uses a standard formula to determine travel time which is based on distance. The results of these tests are shown in the table. It is noteworthy that Tanker 2 had some of the best numbers in the dumping and filling categories.
| Tanker | Dept | Tank Size | Dump Size Arrangement | Dump Time | Dump Rate GPM | Fill Size / Arrangement | Fill Time | Fill Rate GPM | | TA2 | Mechanicsville | 3000 | 10" square rear | 2 min 5 sec | 1429 | 4" line into 4" rear direct fill | 3 min 20 sec | 909 | | E24 | Mechanicsville | 2000 | 6" round rear with jet assist | 2 min 21 sec | 833 | 4" line into 6" rear direct fill | 2 min 33 sec | 769 | | E224 | Mechanicsville | 2000 | 10" square rear | 1 min 31 sec | 1333 | 4" line into rear direct fill | 2 min 57 sec | 667 | | E71 | Hollywood | 2000 | 6" round rear with jet assist | 2 min 14 sec | 909 | 4" line into 3" rear direct fill | 3 min 4 sec | 645 | | E14 | Leonardtown | 2000 | 10" square rear | 1 min 30 sec | 1333 | 4" line into 3" rear direct fill | 2 min 47 sec | 714 | | E51 | Seventh District | 2000 | 10" square rear | 1 min 48 sec | 1111 | 4" line into 3" rear direct fill | 3 min 10 sec | 625 | | E53 | Seventh District | 2200 | 6" round rear | 3 min 22 sec | 647 | 4" line into 2.5" intake thru pump | 3 min 53 sec | 564 | | CATA2 | Prince Frederick | 3000 | 6" round side | 2 min 51 sec | 1034 | (2) 3" lines into (2) 3" rear direct fills | 3 min 15 sec | 909 | | CTA1 | La Plata | 2800 | 12" round rear | 4 min 0 sec | 700 | 4" line into rear direct fill | 4 min 11 sec | 667 | | CTA2 | Hughesville | 1500 | 4" round rear | 6 min 1 sec | 250 | (2) 3" lines into (2) rear direct fills | 3 min 58 sec | 375 | | CTA10 | Bel Alton | 1500 | 5" round rear | 5 min 13 sec | 288 | 3" line into 5" rear direct fill | 3 min 10 sec | 469 | | CE53 | Benedict | 2000 | 6" round rear | 2 min 54 sec | 690 | (2) 3" lines into (2) rear direct fills | 4 min 21 sec | 455 |
Dump Time based on starting 200' away with water tank full, proceed (manuever) to dump site, dump the capacity of the tank, and then proceed 200' away from the dump site.
Fill Time based on starting 200' away with the water tank empty, proceed (manuever) to fill site, fill the capacity of the tank from empty to full, and then proceed 200' away from fill site.
Tests for tankers TA2 through CATA2 conducted on 3/30/02 and filling done by Mechanicsville E23 from draft.
Tests for tankers CTA1 through CE53 conducted on 12/15/02 and fill done by Tenth District, Charles Co. E83 from draft.
Mr. Brower also conducted fire site tests on the first, second and third due pumpers to evaluate our ability to supply the fire attack from a folding tank. Engine 21, Engine 222 and Engine 72 were tested to determine their draft set up times on a folding tank. Engine 23 was tested on the folding tank, at a dry hydrant, at a cistern, at a wet hydrant and at a draft site pond to determine set up times for a tanker fill site.
E21 for set up as a Fire Site Pumper from folding tank = 57 secs
E222 for set up as a Fire Site Pumper from folding tank = 1 min, 0 sec
E23 set up as a Supply Site Pumper from dry hydrant = 59 secs
E23 set up as a Supply Site Pumper from cistern at fire station = 46 secs
E23 set up as a Supply Site Pumper from draft at pond = 1 min, 43 secs
E23 set up as a Supply Site Pumper from hydrant = 51 secs
E23 set up as a Supply Site Pumper from folding tank = 48 secs
E72 set up as a Supply Site Pumper from folding tank = 1 min, 35 secs
Overall, the crews manning the fill lines and setting up the draft with the pumpers did an excellent job with most set ups taking a minute or less. Those incredible times are to be noted with pride.
Our second round of testing will be on May 6th at Hughesville. We will be testing additional Charles and Prince Georges tankers and a Hughesville pumper. |